Filter your results
- 2
- 1
- 3
- 3
- 1
- 1
- 1
- 3
- 3
- 3
- 3
- 2
- 1
- 1
- 1
|
|
sorted by
|
|
Performance assessment of a commonly used “accumulation and wash-off” model from long-term continuous road runoff turbidity measurementsWater Research, 2015, 78, pp.47-59. ⟨10.1016/j.watres.2015.03.030⟩
Journal articles
hal-01145853v1
|
||
|
Evaluation of the Performance and the Predictive Capacity of Build-Up and Wash-Off Models on Different Temporal ScalesUrban Water, 2016, 8 (8), ⟨10.3390/w8080312⟩
Journal articles
hal-01383105v1
|
||
Investigation of the wash-off process using an innovative portable rainfall simulator allowing continuous monitoring of flow and turbidity at the urban surface outletScience of the Total Environment, 2017, 609, pp.17 - 26. ⟨10.1016/j.scitotenv.2017.07.106⟩
Journal articles
hal-01613971v1
|